Projects | Spatz

Project Spatz

Railtec Systems Ltd. provides support to the Stadler Altenrhein AG in drafting the software specification schedule and supplies programming services for most of the requirements mentioned above. This includes control/blocking, monitoring with protection functions and component diagnosis.

Furthermore, the CANopen configuration for the entire CAN network was carried out by Railtec Systems Ltd.. The company also carried responsibility for commissioning, interface checks and function tests for the external nodes.
Software tests for the static and dynamic commissioning were carried out jointly between Stadler Altenrhein AG and Railtec Systems Ltd.

Railtec Systems Ltd. is involved in the following control device software development areas of the Stadler Altenrhein AG’s Spatz project (ABe 130 for Swiss Federal Railways):

CAN network

• external node connection:
  current rectifiers, air conditioning equipment, door controllers, speed measurement
   equipment, passenger information system, diagnostic display
• parameter setting using SDO (Service Data Object)
• SDO communication

Passenger comfort utilities

• heating
• air conditioning control
• connection with passenger information system
• door control

Traction equipment

• transformer
• traction current rectifier
• primary circuit protection
• drive motors
• auxiliary drive rectifiers

Master process control

• vehicle start-up
• pantograph control
• main switch control
• park position
• traction common rail

Multiple traction

 